    为了保证采暖锅炉运行的安全性,在采暖锅炉运行使用前应进行以下检查工作:
    In order to ensure the safety of the operation of the heating boiler, the following inspection should be carried out before the operation of the heating boiler:
    1、检查锅炉所有人孔和手孔盖是否装好,各法兰密封处螺丝是否拧紧等,同时应检查法兰处装置的临时隔板及其它临时堵头是否全部拆除。
    1, check the boiler all manhole and handhole cover is installed, each flange sealing bolts are tightened and so on, also should check the flange device at a temporary partition and other temporary plugging head whether all the demolition.
    2、炉膛及烟道内的积灰及杂物应清除干净。风道及烟道的调节门,闸板须完整严密,开关灵活,启闭指示准确。
    2, furnace and flue dust and debris should be cleared. The regulating door of the air duct and the flue, the gate is closed, the switch is flexible, and the opening and closing instructions are accurate.
    3、锅炉外部炉墙应完好严密,炉门,灰门、看火门和检查门等装置完整齐全,关闭严密。
    3, outside the boiler furnace wall should be intact tight, door, door, door and see the ash check door device is complete, tight closure.
    4、检查安全附件是否完好;旋塞是否旋转灵活、好用;各种仪表和控制装置应齐全,究好、清洁。检查合格后,应使压力表旋塞处于工作状态。
    4, check the safety accessories are intact; whether the rotation is flexible, easy to use; a variety of instrumentation and control devices should be complete, the study is good, clean. After passing the examination, the pressure gauge should be made in the working condition.
    5、锅炉各种管道上的阀门手轮应完好无缺,开关灵活、密封盘根充足。检查合格后,开启锅炉进出水管道上的阀门。
    5, all kinds of boiler valve handwheel on the pipeline should be flexible, flawless and perfect, switch sealing packing enough. After passing the inspection, open the valve on the water inlet and outlet pipe of the boiler.
    6、检查燃烧装置是否完好;对机械传动系统,输煤系统,出碴系统试转正常;调速箱安全弹簧压紧程度应适当,润滑良好;煤闸板尺指示正确。老鹰铁整齐、完好,翻碴板完整,动作灵活。
    6, check the combustion device is intact; the mechanical transmission system, the coal handling system, ballast system test switch to normal; speed safety box spring pressing degree should be appropriate, good lubrication; coal gate length direction is correct. The iron neat and intact, turn the ballast board complete, flexible action.
    7、检查辅助设备联轴器是否连接牢固;三角皮带松紧适当;润滑油应良好、充足;冷却水畅通。检查合格后,装好安全防护罩,分别进行试运转,并注意空转时的电流。除尘装置落灰口,应封闭严密,不可漏风。
    7, check the auxiliary equipment shaft coupling is firmly connected; triangle belt tightness appropriate; lubricating oil should be good, adequate; cooling water flow. After passing the examination, fix up a safety protective cover, respectively, run, and pay attention to the current idling. Dust removing device for dust, should be closed tight, can not leak.
    8、经检查采暖锅炉符合运行要求后,即可开始进行。进水时应开启锅筒上的空气阀。进水宜缓慢,进水期间应检查人孔、手孔及各部位的阀门,法兰是否有漏水现象;否则,应停止上水进行处理。
    8, after the inspection of heating boiler in accordance with the requirements of the operation, you can begin to carry out. The air valve on the pot should be opened when the water is flooded. Water should be slow, water during inspection manhole, hand hole and different parts of the valve, flange is leaking; otherwise, should stop supplying water for processing.
    做好检查采暖锅炉运行前的检查工作,保证采暖锅炉使用的安全性,让采暖锅炉真正为我们服务!
    Do a good job in the inspection before the heating boiler operation, to ensure the safety of the use of heating boilers, so that the heating boiler for us to serve the real!